2000㎥ food waste treatment project
Author:other Time:2021-07-13200 tons/day food waste treatment project
adopts CSTR treatment process, anaerobic unit is 2000㎥,double film biogas holder is 800㎥. After the solid waste is pre-treated, degreasing and crushed, it
is pumped into the CSTR anaerobic reactor for biomass reaction, ensuring proper
TS (%), reaction temperature (℃), and pH (PH=6.8~7.0). Most organic matter is
degraded under working conditions. In the process of organic matter
degradation, a large amount of new energy-biogas can be produced. More than 55%
of the biogas produced is methane gas. Therefore, the biogas can be used to
generate electricity or burn boilers after treatment by purification equipment.
The generated electric energy or heat can not only be used in industry In daily
life, the waste heat generated by the equipment can also heat the anaerobic
reactor to ensure that the anaerobic reactor can carry out biomass energy
reaction within a suitable temperature range.